Notice: Undefined variable: mobiili in /srv/www/htdocs/virtualhosts/www.antsuntupa.fi/en/header.php on line 247

Principal lead designer tasks

Lead designer of a construction project is as CEO in the business world.

  • Helps seeking planning permission and ensures the foillowing
    • Building an application form
    • Construction notification (RH-forms 1-4, according to the measure)
    • Clearing the building site management right
    • Official map showing the construction location
    • Settlement of soil
    • Site plan
    • Main drawings
    • Building area calculations
    • Thermal financial
    • Electric company permit
    • Municipal Technical permit
    • Permit to use road
    • Clearing neighbor consultation
    • Energy calculation and certificate
  • Obtain planning required for the initial data
  • Ensures plans coverage
  • Ensure all plans farm out
  • Respond to design a whole and the various plans for compatibility
  • To ensure that plans are in content and quality requirement set forth in
  • Ensure farm out the necessary modifications if the plans require the compatibility
  • To meet the general quality of design, including design engineers to participate in the special control
  • To ensure that your mouth is connected to the bone enough for each specific area of expertise
  • Scans designers competence and inform the building control, if this problem occurs
  • If necessary, second the question of the validity of the lead designer construction supervision
  • Require, where appropriate, the missing plans
  • Ensure that the following construction drawings submitted to building control:
    • Carry loads of vertical and horizontal structures,
    • Heat, humidity and water insulations,
    • Building materials, components and accessories and strength values
    • Loads on structures
    • Permissible ground pressure and pile loads attached to the soil and foundation research.
  • Attend start meeting
  • Ensure consistency with the zoning plan of the project
  • Ensure construction compliance with permit conditions
  • Responsible for ensuring that the building is the right place
  • Ensure that the lead designer be exposed to such tasks, which do not fall within his field of expertise
  • Ensures fire safety issues, for example, arrange for any necessary compartmentation, exits and other related fire safety matters.
  • Take care of that building, operating and maintenance instructions in the contents is not contradictory